Walnut CreekADU Builders

ADU Types Compared: Detached, Attached, Garage, JADU and Prefab

A junior ADU or garage conversion is the least expensive way in ($110,000–$250,000+ in Contra Costa); a detached ADU gives the most privacy at $250,000–$450,000+. Prefab is a way of building a detached unit, not a different set of rules.

EXISTINGHOMELIVINGKITCHENJADUEFFICIENCY KITCHENBATH≤ 500 SQ FTJunior ADU carved from existing space: own exterior door, efficiency kitchen, door to the main home

Side by side

The five options

DetachedAttachedGarage conversionJunior ADUPrefab
What it isNew separate buildingAddition joined to the homeExisting garage made livableSpace inside the home, ≤500 sq ftFactory unit on a local foundation
State size limitUp to 1,200 sq ft; 800 guaranteedUp to 50% of the homeSize of the structure500 sq ftAs detached
Setbacks4 ft max side/rear4 ft max side/rearNone for existing structureNone (inside home)4 ft max side/rear
Cost (Contra Costa)$250,000–$450,000+$220,000–$380,000+$150,000–$250,000+$110,000–$180,000+$300,000–$450,000+ (800 sq ft, Bay Area, all-in)
Typical timelineLongest; often about a yearLong; structural tie-inShorterShortestShorter build on site; same permits
Sewer (Central San)Ties into house lateral downstream of cleanoutNo separate lineDepends on locationNo separate lineAs detached
New utility feeProportional if 750+ sq ftProportional if 750+ sq ftNone for existing spaceNoneAs detached
Owner occupancyNot requiredNot requiredNot requiredOnly if sanitation is sharedNot required
Best forRental, family, privacyAging parents close byBudget, speedAdult child, caregiverStandard layouts, easy access

Sizes and rules: Gov. Code §66314, §66321, §66324, §66333. Costs: Mazzamuto Construction (Contra Costa) and IMKAT (Bay Area prefab), 2026. Sewer: Central San.

Not sure which type fits your lot?Get a Quoteor call (925) 709-5438

Plans

What each type looks like on paper

LIVING · KITCHENBEDROOMBATH30'-0"20'-0"± 600 SQ FTNSample layout · 1 bed / 1 bath detached ADU
Detached: a separate one-bedroom cottage.
EXISTING DRIVEWAYSTUDIOBATHKITCHENETTENew wall + windowin the old door opening20'-0"20'-0"± 400 SQ FTN
Garage conversion: a studio inside a two-car garage.
EXISTINGHOMELIVINGKITCHENJADUEFFICIENCY KITCHENBATH≤ 500 SQ FTJunior ADU carved from existing space: own exterior door, efficiency kitchen, door to the main home
Junior ADU: up to 500 sq ft within the home.

Detached ADUs → · Garage conversions → · Prefab ADUs → · Cost by type →

FAQ

Choosing a type

What are the drawbacks of an ADU?
High cost (roughly $110,000–$450,000+ depending on type), a long timeline, lost yard or garage space, construction disruption, possible panel or sewer upgrades, and higher property tax on the new construction. You also can't sell the ADU separately from the house.
What is the difference between an ADU and a JADU?
A junior ADU is up to 500 sq ft carved out of the existing home (including an attached garage), with at least an efficiency kitchen; it may share a bathroom with the house. An ADU can be detached, attached or converted and has its own full kitchen and bath. Owner occupancy can apply to a JADU only when it shares sanitation with the main home.
Which ADU type adds the most value?
It depends on the lot and the market; this site doesn't give investment advice. Detached units offer the most privacy, conversions the lowest cost per finished unit. Ask a local appraiser or agent for comparable sales.

Next step

Ready to price your ADU?

Share your lot and goals. A local ADU builder can review feasibility and give you a quote.

Call NowGet a Quote